Records not linked to a specific agenda item
- the hip wing of the rooftop addition does not extend taller than the side gabled ridge
- require applicant to bring back an alternative compliant design before the commission in public with full community notice before any approval finalized or permit issued
- need to see revised drawings and a recommendation before commission can make the decision; cannot decide in this meeting without them
- roof form must be lower than the side gable; hipped or other roof form acceptable if lower than side gable
- the application includes an outbuilding that staff recommends for approval; could be separated and approved independently of the addition
- Staff recommends approval of proposed addition and outbuilding with standard conditions plus a non-standard condition (number two)
+5 more conditions
Jamie Sims: what are our next steps / seeking commission guidance on the rear-addition-guideline proposal
SPEAKER_03: If the applicant needs to see drawing changes before approval, does this need to be disapproved or does the applicant need to withdraw?
SPEAKER_05: Could we move to approve the staff recommendation with a further condition that revised roof plans be seen by the chair or executive committee?
SPEAKER_05: Jenny, what's the deadline for next month's submittal?
Commissioner Gadd: For condition two, does that include siding?
+2 more exchanges
- up to twenty minutes total, two minutes per speaker, limited to non-public-hearing agenda items — Chair
- limited to agenda items for which a public hearing will not be held — Chair
- tentative consent item pulled at public request — Melissa
- chair agrees to hold a public hearing and present the project — Chair
+4 more procedural steps