Note.—This resolution in the Bulletin. Please formal errors so that BOARD MEETING OF: CALENDAR NO.: PREMISES: ACTION OF BOARD THE VOTE — Affirmative: Chair Commissioner Commissioner Negative: THE RESOLUTION The decision 2021, acting on New pertinent part: “The mapped street, which City Law, therefore, This is an application permit, in an R1-2 Development District, Construction Authority fronting on a mapped A public hearing after due notice by on April 25, 2022. approval of this application. The Premises to the north, Stecher and Kingdom Avenue the Special South With approximately of depth, and 115,300 occupied by an existing early childhood play one-story annex addition. GCL § 36 (2) A city having of occupancy street or highway placed on the any other mapped structure shall the department standards and adequate in welfare for the highway, or, department of naming the city full cost of such or other security improvement department….Where section would and where the structure to be the applicant the decision issuance of certificates appeals or other variances or provisions are as are provided The applicant building adjacent facility, with the main Street. The applicant physical connection addition and the Additionally, the applicant new 3,200 square 3,424 square feet Environmental Protection system requirements By letter dated Borough President a record width of map; and is the subject 27, 1999, as in-use Avenue along the appear on the final Opinion of Dedication 1931. Additionally, width of 70 feet; does is the subject of an dated February 23, side of Deisius Street width of 60 feet; does is the subject of an dated January 5, 2000. the southeastern record Eylandt Street has final New York City Pursuant to the that because all streets GCL § 36 (2) is addition would not could not move forward. approval, it would conditions with additional No. 31 from accommodating Furthermore, the difficult for the NYC of class size reduction classrooms. Moreover, the project, the SCA received to the zoning envelope Per the SCA’s enabling Uniform Land Use necessary zoning Workforce Development. following Mayoral a. The proposed bulk zoning (Z.R. § 24-34), plane (Z.R.§ zoning lot, Z.R. sections. facilitates building Furthermore, also minimizes Historic requires facilitate b. A zoning indicated requested, able to provide 25-30 requires area and spaces) as expanded the expanded states that system to the available At hearing, the comply with the Safety’s comments sidewalk along the Avenue and Stecher alignment along the Steet to Eylandt Street, Street; 3) if SCA is Provide receiving paving to stop sign Street to prevent receiving ramps at remove the proposed Street and replace “SCHOOL” markings (“BPP”). In response, Technical Memo which By letter dated the Fire Department, reviewed the application its office and a preliminary regulations of the respect to fire apparatus Based upon the “Conditional Letter are found not to be Department will Appeals of such non-compliance. The project is Part 617.4. On October SEQR No. 21-011, Environmental Conservation conducted an environmental documented relevant Environmental Assessment SEQR No. 21-011, the project as proposed Land Use, Zoning, Community Facilities; Resources; Urban Hazardous Materials; and Sanitation Greenhouse Gas Character; or Construction. For Historic related impacts on Richmond school that it would prepare implemented in consultation implemented prior on the site. For Hazardous vapor barrier and integrated into the declares that all construction would state, and federal for areas of the project building addition environmentally clean applicant represents affected by the project construction and properly NYC SCA determined environment which Statement are foreseeable. By letter dated New York City Department approval of applications to DOB for an authorization and certification pursuant material. By letter dated Environmental (“DEP”) will be discharged #19049. The proposed City water mains Ave
… (truncated, full text in PDF)