Note.—This resolution in the Bulletin. Please formal errors so that BOARD MEETING OF: CALENDAR NO.: PREMISES: ACTION OF BOARD THE VOTE — Affirmative: Chair Commissioner Commissioner Negative: THE RESOLUTION The decision 2021, acting on New pertinent part: “The a mapped street is This is an application permit, in an R3-2 a two-story, Use Group partially in the bed A public hearing after due notice by hearings on October 2023, and then to Staten Island, recommends longstanding opposition streets. Vice-Chair and surrounding area. The Premises Boulevard and Jefferson and the Lower Density With approximately of frontage along the Premises are currently GCL §35, in permits for development Where a proposed such official map not acquired as hereinabove structure in reasonable requirements interest as requirements The applicant UG 6, commercial FAR); one parking height of 14 feet; 0 at the first floor and proposed parking door located on Jefferson that the entire building with the underlying Lower Density Growth states that the proposed Zone regulations elevation, which, (“FEMA”) flood map, feet. Pursuant to GCL proposed building mapped but unbuilt City map. As per states that e proposed the bed of this unbuilt proposed street wall continuity of the the applicant submitted demonstrates that, surrounded by commercial, one- and two-family By letter dated Department., Bureau the application, and applicable rules and New York concerning fire hydrants. It is those outlined in the City Construction Based upon the “Letter of No Objection” conditions are found Department will non-compliance. By correspondence Department of Environmental its maps, there are 8″ dia. water main Boulevard and Boundary of 12, dated January dia. storm sewer in location. The applicant October 5, 2021. Jefferson Avenue, from which 50′-0″ and/or reconstruction main. Based on the proposed GCL § 35 By letter dated Transportation (“DOT”) Borough President’s contrary to General the bed of a mapped According to the Bureau, Jefferson Place, is mapped Counsel Opinion dated 4/13/1931. There +/- on the Northeast feet +/- on the Southwest additional ten (10) Island Borough President’s their letter that a status of the additional DOT has reviewed and has no objection have an impact on 1. Please note (50) feet of additional DOT as part 2. Please be a joint Department proposed roadway reconstruction (MIBBNC05B) the process that the determine in the future. 3. Please also involve DOT’s Inspection pedestrian other pertinent ensure compliance regulations. Over the course the proposed and surrounding area, Boulevard and Jefferson vehicular maneuverability. revised plans detailing building, as well singular curb cut regarding proposed flood proofing requirements and dimensions pavement markings, Accordingly, appropriate with applicant has substantiated Therefore it is does hereby modify August 13, 2021, acting under the powers Law, to permit the a mapped street, conform to drawings Approved: February condition: the Builder’s THAT the improvements prior to the issuance (“TCO”); DOB shall THAT with all of the applicable unbuilt portion of THAT the above occupancy; THAT a certificate calendar number four years, by February this approval THAT response to objections the approved THAT the portions related the Department THAT all other applicable Administrative Code, jurisdiction irrespective relief granted. Adopted by the Board
2021-57-A
Proposed construction of a two-story commercial (UG 6) building located partially in the bed of a mapped street contrary to General City Law §35. C2-1/R3-2 zoning district.
BSA Decision
Full decision PDF
View PDF →Decision Excerpt
Want to dig deeper into 2021-57-A?
Ask Zonable about the reasoning, similar precedent cases, or how it applies elsewhere.