Note. —This resolution in the Bulletin. Please notify formal errors so that corrections BOARD MEETING OF: CALENDAR NO.: PREMISES: ACTION OF BOARD THE VOTE — Affirmative: Chair Commissioner Commissioner Negative: THE RESOLUTION — This is an application construction and obtain previously granted December 11, 2025. A public hearing after due notice by publication on September 8, 2025. the Premises and surrounding The Premises are between 97th Street With approximately 20 depth, and 2,000 square vacant. The Board has exercised 24, 2021, when, under a variance pursuant to story, plus cellar, single-family, comply with the zoning yards (Z.R. § 23-461), condition that all work with the application; a maximum of 0.81 FAR on the first floor and one side yard with a 7′-6″ between buildings front yard planting, and on Board-approved certificate of occupancy; approval and calendar additional six months, exist within the City coronavirus disease, the relief granted by by the Department approved only for the the Department of applicable provisions Code and any other relevant plans or configurations The time to complete occupancy set to expire, instant application, the in furtherance of the were delayed due to financial difficulties. with construction and, At hearing, the Board complete the proposed detailed timeline to proposed project and requested four-year submitted a project timeline funding but that, at place but predicts that to six months. The secured, it would have TR3, etc.) under the take approximately two contends that after the the necessary permits between 18 and 24 represents that after of obtaining sign-off estimated to take about Based upon its that a four-year extension a certificate of occupancy forth below. Therefore, it is Resolved, does hereby amend amended this portion to complete construction years, expiring on September the bulk THAT maximum of 0.81 FAR the first floor and 784 side yard with a minimum between buildings containing yard planting, and one Board-approved plans; the above THAT occupancy; substantial THAT with Z.R. § 72-23 a certificate THAT calendar number (‘BSA four years, by September this approval THAT response to objections the approved THAT the portions related to the Department THAT all other applicable Administrative Code irrespective of plans or Adopted by the Board
2019-91-BZII
Extension of Time to Complete Construction of a previously approved Variance (§72-21) to permit the development of a two-family residence which expires on December 11, 2025 R3X zoning district.
BSA Decision
Full decision PDF
View PDF →