Note.—This resolution is in the Bulletin. Please notify formal errors so that corrections BOARD MEETING OF: CALENDAR NO.: PREMISES: ACTION OF BOARD THE VOTE — Affirmative: Chair Commissioner Commissioner Negative: THE RESOLUTION — The decision of November 29, 2019, 321192437, reads in pertinent “Proposed not permitted District requires Standards 73-36.” This is an application a site located within culture establishment level of a proposed commercial, and community A public hearing after due notice by publication on October 5, 2020. The Premises are Marcy Avenue to the Havemeyer Street to Brooklyn. With approximately Street, 124 feet of frontage along South Fourth Street, and 50,738 square construction of a proposed commercial, and community individual landmark Commission as “The The Board has March 21, 2017, when, granted a special permit, reduction in the required for Use Group 6 offices to Z.R. § 36-21, on condition drawings as they apply certificate of occupancy requirement category parking category B spaces sufficient to meet within the permitted certificate of occupancy; four years, by March granted by the Board Department of Buildings; only for the portions Department of Buildings provisions of the Zoning other relevant laws under configurations not related The Board notes Z.R. § 73-03. The Board prescribed certain conditions permit in order to minimize upon other property and that such conditions building permit and certificate that failure to comply constitute a violation basis for denial or revocation occupancy and for all the Board notes that area in which the subject The applicant represents feet of floor area on climbing, fitness, lobby, floor space on the cellar exercise room. The PCE from 7:00 a.m. to 12:00 The applicant represents essential character surrounding area because level and first floor of the character of the compatible uses including drinking establishments, that the PCE is so located future use or development The applicant submits instruction and programs weight reduction, and use is consistent with the issuance of the special has performed a background operator of the establishment report, which the Board submits that, while the the closest residential to ensure the PCE occupied spaces. These the fitness area with tiles to prevent sound PCE will not impact neighborhood and the surrounding area. The applicant states system will be maintained dated August 21, 2020, have a fire suppression tested and self-certified signed-off. A fire alarm approved. A ”Letter of make repairs to the Occupancy, fire guards until the fire alarm system Based on the foregoing, application. At hearing, requirement pertains the PCE. By letter dated 22171), the Landmarks to the elimination constructing a stair construction of an secondary north and a new elevator tower of the proposed landmark material on the existing east parapet and the along the length of the constructed off of the the first floor of the access into the new building Accordingly, the safeguards imposed, at large of the PCE use by the community. In the PCE will not interfere The project is classified Part 617.5. The Board action noted in the CEQR 5, 2020. Therefore, the Board record supports the requisite to Z.R. §§ 73-36 and basis to warrant exercise Therefore, it is Resolved, does hereby issue a Type and 617.3, §§ 5-02(a) Environmental Quality required findings under located within a C4-3 establishment on portions 23-story with cellar mixed-use facility building, contrary site conditions and operations application marked “Received further condition: the Board THAT Premises and such must under BSA Cal. No. 2016-4244-BZ this grant THAT October 5, 2030; there shall THAT of the physical culture approval from the Board; minimum THAT maintained leading to maintained unobstructed, an approved THAT maintained in the entire approved plans; accessibility THAT forth in applicable accessibility Chapter 11 of the NYC Standards Institute (ANSI) Disabilities Act, as revi
… (truncated, full text in PDF)