Note. —This resolution in the Bulletin. Please formal errors so that BOARD MEETING OF: CALENDAR NOs.: PREMISES: ACTION OF BOARD THE VOTE — Affirmative: Chair Commissioner Commissioner Negative: THE RESOLUTION The decisions October 26, 2018, 421469716, read, mapped street, contrary This is an application permit, in an R1-2 plus attic and cellar, the bed of a mapped A public hearing after due notice hearings on May February 28, 2023, 2024, and then to Commissioner Yoon area. The Board also this application, citing concerns about space, light, and air; The Premises located on the south Salerno Street, within Premises have a Dunton Avenue, an western lot line of 61, 12,211 total square GCL § 35 provides development within For the purpose plan no permit bed of any street plan, provided, street or highway owner, the board which has established variances or a specific case permit for a building as practicable or tend to cause board may impose granting such benefit of the Where a proposed such official map acquired title hereinabove structure in reasonable requirements interest as requirements Originally, the separate tax lots located lot at the center of 37 Palermo Street, Lot 90), which, at applicant represented 160), four would require and two would require In response to of the initial proposal, seeks two waivers story, plus attic subject Lots 160 applicant indicates feet of floor area (resulting and 0.48 FAR on Lot 20 feet of width, rear The applicant represents the underlying requirements The applicant to allow it to realize increase the cost of change of such Furthermore, the street, Clover Place, ten years and the pursuant to GCL § is almost entirely be built on that lot declares, citing DOB without the subject requiring a second Dunton Avenue and which would not site. By letter dated Prevention, stated, former hospital site, suppression system not being maintained this condition was observed by its office, vandalism. FDNY suppression systems present at the time water in the systems also described that, Fire" of the NYC compliance with the Section FC311.1 structure or constitute a safeguarded of this section, been deemed Administrative 311.2 Temporarily buildings, structures, spaces, shall section. 311.2.1 Security. accessible to locked or otherwise persons. 311.2.2 Fire systems shall all times, except 311.2.3 Fire barriers, and unoccupied tenant be maintained. resistance-rated Chapter 7 of 311 .3 Removal structure or premises, any temporarily part thereof, of rubbish and premises. 311.3 Removal structure or premises, any temporarily part thereof, of rubbish and premises. FDNY continued Fire Suppression conditions and in Department had issued letter. FDNY explained 1) Violation Order system to normal hydrostatic pressure (two fire department contractor and 2) Violation system to normal hydrostatic pressure department connections) and witnessed FDNY also contended the former hospital Board for a waiver requested that the applications until with. Based upon objected to the violation orders have review the application development. By letter dated Fire Prevention, states, of No Objection subject lots pursuant By letter dated Environmental Protection based on DEP maps, Clover Place. There 8" dia. City water Street. The Drainage dated March 24, 2009, sewer in the bed of Hill Road, and 10" bed of Dunton Avenue has submitted Plot 2018. The plans show of Palermo Street, maintenance, and/or and water main. The dia. sanitary sewer Dunton Avenue and also fronting the existing Avenue east of Palermo Place may be initiated on the above, DEP application. By letter dated of Transportation the Office of the Clover Place is mapped Clover Hill Road, Dedication (“CCO”) the City does not reviewed all pertinent objection to the recommendations: 1. The applicant Line/widening 2. The applicant width of Dunton site plan should be condition 3. There should Dunton Avenue The applicant 4. As the prior the entire January filed, which the full plan street
… (truncated, full text in PDF)