Note.—This resolution is in the Bulletin. Please notify formal errors so that corrections BOARD MEETING OF: CALENDAR NO.: PREMISES: ACTION OF BOARD THE VOTE — Affirmative: Chair Commissioner Commissioner Negative: THE RESOLUTION — This is an application construction and obtain previously granted variance, construction of a three-story, residence that does not expired on July 14, 2025. A public hearing after due notice by publication on September 8, 2025. The Premises are of the intersection of Road West, within approximately 14'-8-1/4" frontage along Clearview of width along the lot lot area, the Premises The Board has January 11, 2021, when, granted a variance, under three-story, plus cellar, comply with the zoning 22-00), FAR (Z.R. § 23-142), 32), front yards (Z.R. condition that all work with the application; a maximum of 0.82 FAR in the cellar, 638 square feet of floor area on the on the third floor), a front 30'-6" and a front yard with a minimum depth width of 27'-6"; the Premises vehicles until construction certificate of occupancy; approval and calendar obtained within four current state of emergency York resulting from an 14, 2025; the approval response to objections the approved plans related to the specific ensure compliance with Resolution, the Administrative under its jurisdiction to the relief granted. The time to have certificate of occupancy extension. The applicant states Further, the applicant for the garage structure the end of 2025. commencing in Spring full years. In response to Board an anticipated project revised the submission and obtain a certificate a four-year extension Based upon its that a four-year extension conditions as set forth Therefore, it is Resolved, does hereby amend the amended this portion to obtain a certificate 8 2029, on condition: the bulk parameters THAT maximum of 0.82 FAR the cellar, 638 square feet of floor area on the on the third floor), a front 30'-6" and a front yard with a minimum depth width of 27'-6"; the Premises THAT vehicles until construction all conditions THAT in effect; the above THAT occupancy; a certificate THAT calendar number (‘BSA within four years, by this approval THAT response to objections the approved THAT the portions related to the Department THAT all other applicable Administrative Code irrespective of plans or Adopted by the Board
2018-142-BZ
Variance (§72-21) to permit the development of a two-story plus attic & cellar Use Group (“UG”) 2 residential building contrary to ZR §§22-00 (Zero Lot line building) & § 32-461a (Side Yard less than
BSA Decision
Full decision PDF
View PDF →ZR Sections Cited (2)
Decision Excerpt
Want to dig deeper into 2018-142-BZ?
Ask Zonable about the reasoning, similar precedent cases, or how it applies elsewhere.