2016-4286-A APPLICANT – NYC Mayor’s Office Recovery Operation (“HRO”) SUBJECT – Application October City Law 35 Waiver for the reconstruction located withing the bed of damaged/destroyed by Hurricane registered in the NYC Build it Back PREMISES AFFECTED – 472 Block 16042, Lot 35. Borough of COMMUNITY BOARD #14Q ACTION OF THE BOARD – Application condition. THE VOTE TO GRANT – Affirmative: Chair Perlmutter, Vice-Chair Commissioner Ottley-Brown, Commissioner and Commissioner Chanda..............................................5 Negative: .........................................................................0 THE RESOLUTION – WHEREAS, this is an application certain of the Board’s Rules of Practice to allow for the elevation or reconstruction Family home on a portion of a site that of a mapped street, contrary to General § 35; and WHEREAS, a public hearing application on November 15, 2016, publication in The City Record, and the same date; and WHEREAS, this application is the owner by the Mayor’s Office of Operations (“HRO”) and the Build which was created to assist New York affected by Hurricane Sandy; and WHEREAS, in order to accept HRO on behalf of the owner, and in City’s effort to rebuild homes impacted Sandy expeditiously and efficiently, pursuant to 2 RCNY § 1-14.2, the following of Practice and Procedure: (1) 2 (Objection Issued by the Department RCNY § 1-06.3(b) (Filing Period), 06.4(b) (Application Referral), (4) 2 (Hearing Notice), and (5) 2 RCNY Authorization); and WHEREAS, the Board notes application is exempt from fees pursuant 09.2 and NYC Admin. Code § 25-202(6); WHEREAS, the subject site is Street within a R4A zoning district, in WHEREAS, by letter dated October Department of Environmental Protection that there are no existing or planned DEP associated with the subject site and objections to the proposed application, (1) no building or other structure may an existing DEP-managed water confirmed by a survey prepared by licensed land surveyor; (2) if a proposed structure is not within the exact footprint Hurricane Sandy building or other replaced or repaired, the proposed structure may not be within 5 feet existing water or sewer main, as confirmed 2016-4286-A construction is proposed in part within mapped street; such bulk waivers necessary to address non compliances location of construction within and outside street, and the zoning lot will comply extent feasible with all applicable zoning the street were not mapped; and WHEREAS, therefore, consistent and ZR § 72-01(g), the Board finds that regulations across the portion of the subject mapped street and the portion of the subject mapped street as if the lot were unencumbered mapped street is both reasonable and the proposed construction; and WHEREAS, accordingly, the Board that the applicant has submitted adequate warrant this approval under certain conditions. Therefore it is Resolved, that the and Appeals waives the above-referenced Practice and Procedure, and authorizes 35 and also waives the bulk regulations the presence of the mapped but unbuilt Section 72-01(g) of the Zoning Resolution appeal on condition that the proposed reconstruction will comply with all district requirements; and that all other rules and regulations shall be complied further condition: THAT no building or other constructed over an existing DEP-managed main, as confirmed by a survey prepared State licensed land surveyor; THAT if a proposed building not within the exact footprint of the pre-Hurricane building or other structure being replaced proposed building or other structure feet of a DEP-managed existing water confirmed by a survey prepared by licensed land surveyor, unless DEP has such limitation does not apply; THAT if a proposed building within the exact footprint of the pre-Hurricane building or other structure being replaced proposed building or other structure of a DEP-managed existing water confirmed by a survey prepared by licensed land surveyor; THAT if a proposed building
… (truncated, full text in PDF)