Note.—This resolution in the Bulletin. Please formal errors so that BOARD MEETING OF: CALENDAR NO.: PREMISES: ACTION OF BOARD THE VOTE — Affirmative: Chair Commissioner Commissioner Negative: THE RESOLUTION The decision February 22, 2019, pertinent part, “The building in zoning resolutions and plans under Cal. # 187-97-BZ This is an application previously granted the use of the site A public hearing 2019, after due continued hearings then to decision Commissioner Sheta surrounding neighborhood. The Premises Boulevard and 148th district and partially approximately 160 of frontage along square feet of which Premises are occupied includes tax lot 39 The Board has March 15, 1949, granted a variance, the portion of the to include the balance application, on condition and the plot leveled arranged substantially the interior lot lines 5'-6" in height; a 148th Street for a be maintained as concrete curbing; proposed and comply Building Code; pumps line of Rockaway tanks not exceed six 148th Street constructed Rockaway Boulevard not exceeding 35 feet than five feet to prolongated; at the line of 148th Street 12 inches in height, occupied by pumps other suitable reasonably curbs be restored president; the portion maintained outside a permanent sign to the globes of the all roof signs, but standard for supporting on sale, but permitting beyond the building portable fire-fighting directs; and, all permits year. On that same granted an application, Premises within the for entrance to the requirements of the BZ be complied with; under BSA Cal. No. 148th Street but be of 148th Street. On July 15, amended the resolution tanks. On May 21, amended the resolution On June 2, extended the term amended the resolution condition that other in all respects and On July 20, granted a special the enlargement service station with Rockaway Boulevard intersection of 149th feet as shown on be complied with; one year, by July On October 3, amended the special On March 19, amended the special fences along 148th opaque; a median to protect the fence resolution be complied On January Board granted a existing operation store, and the installation MPDs and underground conform to drawings application; signage plans; fencing and approved plans; lighting plans and be positioned uses; the Premises conditions appear approved, be subject compliance with Resolution, the Administrative under the jurisdiction The applicant the existing building rearrangement of DOB Technical Policy 10/99 states, in pertinent will be deemed accessory the same zoning lot retail use shall be and it shall be contained the accessory retail of either 2500 square area, whichever accessory convenience lesser of 2,500 square feet). Over the course the maintenance residential properties Premises from nearby In response, foot deep planting reduce light levels the dumpster facing compliance before By letter dated that a review of their with their permits equipment, underground chemical) system. application, as the the Premises and By letter dated that, during the September made that the Premises on site. A complaint Fire Prevention by 15, 2020, inspectors inspected and found inspection of existing at the time of the dispensing operations representative was of Fitness within follow-up inspection violation order. Based objection to the application, continue to inspect regulations. Based upon that the requested conditions as set forth Therefore, it is does hereby amends through January resolution shall enlargement of the conditions and operations application marked and on further condition: light THAT shared with residences; the side THAT residential properties all fencing, THAT masonry shall be replaced, as necessary; the Board THAT Calendar Number 2024, at which the Board’s conditions compliance may enforcement action in three THAT submit to the Board, lighting level study Administrative Notice, property line shared signage THAT plans; fencing THAT BSA-approved plans; lighting THAT plans and shall resi
… (truncated, full text in PDF)