Nicholas Tortorella
Architect / engineer
Appearances
11
extracted records
Meetings
1
01
Every appearance on the record
1 meeting02
In their words
from the transcript“those intersections are all included in the traffic analysis that was conducted as part of the FEIS”Jul 1, 2025 →
“Nicholas Tortorella with Stonefield Engineering and Design, part of the applicant team”Jul 1, 2025 →
“the current roadway is about 18 to 20 feet wide, sometimes provides two moving lanes”Jul 1, 2025 →
“the city DOT requested that we provide two moving lanes adjacent to the curbside parking lane”Jul 1, 2025 →
“The purpose of the bicycle lane is not necessarily to serve our project”Jul 1, 2025 →