5-13-BZ
Variance (§72-21) to permit the construction of an education center (UG 3A) in connection with an existing community facility (Louie Armstrong House Museum), contrary to lot coverage (§24-11/24-12), f
July 23, 2013
Hearing date
Address
34-47 107th Street
Amendment of a previously approved Variance (§72-21) permitting the addition of three floors to an existing one story and basement UG 4 synagogue for a religious-based college and post graduate (UG 3
Variance (§72-21) to permit the enlargement of of an existing school contrary to underlying bulk requirements. R5 zoning district.
Variance (§72-21) to permit the development of an accessory community center to an existing House of Worship (UG 4) contrary to underlying bulk requirements. R4 zoning district.
Variance (§72-21) to permit the construction of a three-story House of Worship (UG 4) contrary to underlying bulk requirements. R4-1 zoning district.
Variance (§72-21) to permit the development of a school (UG 3) (Yeshiva Ohr Shraga D’Veretzky) contrary to floor area ratio (ZR § 24-111), lot coverage (ZR § 24-11), wall height (ZR § 24
Variance (§72-21) to permit the construction of an educational and cultural facility be located on the premises, located within an R4B zoning district.
Variance (§72-21) to permit the vertical extension of an existing not for profit religious school. R5 zoning district.
Extension of time to complete Construction and obtain a Certificate of Occupancy for a Use Group 4 three-story synagogue (Jewish Center of Kew Gardens) religious school, and Rabbi's apartment, which e