2018-172-BZII
Extension of Time to Complete Construction and Obtain a Certificate of Occupancy of a previously approved variance (§72-21) to permit the development of multiple dwelling residence comprising of 21 un
May 19, 2025
Hearing date
Address
46-09 /46-19 31st Avenue
Variance (§72-21) to permit the development of multiple dwelling residence comprising of 21 units of Permanent Supportive Housing contrary to ZR §23-142 ( open space); ZR §§23-22, 23-24 and 24-20 (max
Variance (§72-21) to permit a proposed community facility and residential building (St. Albans Presbyterian Church), contrary to floor area (§§23-141, 24-161), maximum dwelling unit (§§23-22, 24-20),
Variance (§72-21) to permit the construction of a 12-story mixed residential (UG 2 supportive housing) and community facility (St. Simeon’s Episcopal Church) (UG4 house of worship) building, contrary
Variance (§72-21) to allow an eight (8) story residential building with ground floor community facility use to violate applicable regulations for dwelling unit density (§23-22), street wall height (§2
Variance (§72-21) to permit the proposed construction of a six-story residential and community facility building, Use Group 2 and 4, located in an R5B zoning district, which does not comply with the z
Variance (§72-21) to permit the development of a 22-story residential building containing 282 units of permanently affordable housing and supportive non-profit housing contrary to underlying bulk regu
Variance (§72-21) to permit the enlargement of of an existing school contrary to underlying bulk requirements. R5 zoning district.
Amendment of a previously approved Variance (§72-21) & Special Permit (§73-66) to permit the construction of a 17-story mixed-use building contrary to underlying bulk requirements and located within a