238-14-BZ
Variance (§72-21) to permit the construction of two mixed residential and commercial buildings on a single zoning lot contrary to §§35-21 & 23-145 (Lot Coverage), 35-24c (Height and setback), 35-52 an
June 23, 2015
Hearing date
Address
98-100 Franklin Street
Community Board
Manhattan Community Board 1Variance (§72-21) to permit a one-story above-ground extension for a community facility (UG 3) (Fashion Institute of Technology (FIT) which exceeds the maximum permitted community facility floor area
Variance (§72-21): to permit the proposed structure in rear yard of the interior lot portion of the site contrary to (ZR 33-23 and ZR 33-26) of the zoning resolution. Located within an C5-5 SLMD) zoni
Variance (§72-21) to permit an enlargement to an existing school (Stephen Gaynor School), contrary to lot coverage (§24-11), rear yard (§24-36/33-26), and height and setback (§24-522) regulations. C1-
Extension of Time to Complete Construction of a previously granted Variance (§72-21) for the construction of a three-story with cellar, office building (UG 6B), which expired on January 23, 2011; Waiv
Variance (§72-21) to allow for the construction of a community facility (The Abraham Joshua Heschel School), contrary to height and setback, and rear yard requirements. (§§33-432, 23-634, 33-432). C6-
Variance (§72-21) to permit the development of a three- and eight-story school building. The proposal is contrary to ZR Section 35-24c (minimum base height). R9A with a C1-5 district overlay.
Variance (§72-21) to allow proposed 11-story residential building with ground floor retail located in a C6-2A district; contrary to Z.R. §§ 35-00, 23-145, 35-52, 23-82, 13-143, 35-24, and 13-142(a).
Variance (§72-21) to request a bulk variance to allow the construction of a new drug store without the required parking in a C4-1 district, contrary to Z.R. §§33-23(B) and 36-21.